/
/
Construction & Infrastructre

Construction & Infrastructre

Description

Heavy Equipment Parts for the Construction & Infrastructure Industry

National construction and infrastructure projects operate under tight deadlines; if even one unit is idle while waiting for spare parts, the project schedule is delayed and equipment rental costs skyrocket. Buana Penta Prima supports contractors and heavy equipment operators with genuine and OEM spare parts for excavators, bulldozers, wheel loaders, and cranes, backed by a digital quotation system we’ve been developing since 2008 so that project procurement teams can receive quotes quickly.

Challenges

Operational Challenges in Construction Projects That We Understand

  • The high number of start-stop cycles in urban projects causes the electrical system (battery, starter motor) to degrade more quickly.
  • Projects often change locations, so a distributor with a national not just local delivery network is needed.
  • Many projects use rental equipment with a mix of brands, so the availability of cross-brand parts is crucial.
  • Tight project deadlines make parts lead times a key factor in determining whether late penalties can be avoided.
Product Catalog

Product Catalog We Offer

Brands & Models of Equipment We Service

BrandCommon Unit Types in Construction ProjectsMain Parts Category
CaterpillarExcavator 320/325, Dozer D6/D8, Wheel Loader 950/966Engine Parts, Hydraulic & Undercarriage
KomatsuWheel Loader WA200/WA380, Excavator PC200Hydraulic & Undercarriage, Batteries & Electrical
KubotaExcavator compact seri KX, engine V3800Engine Parts, Filters & Lubricants
Cummins / PerkinsEngine untuk crane & concrete pumpEngine Parts, Genset Parts

Featured Products for the Construction Sector

Product CategoriesExamples of Frequently Searched ItemsWhy It’s Relevant to Construction
Engine PartsPiston kit, cylinder head, gasket, crankshaftThe unit operates with fluctuating load variations
Hydraulic & UndercarriageHydraulic pump, control valve, cylinder seal kitRepeated digging and lifting operations accelerate seal wear
Batteries & ElectricalBattery heavy duty, starter motor, alternatorThe high start-stop cycle typical of urban construction projects
Safety & WeldingWelding machine, APD project-standardCompliance with K3 Standard Operating Procedures (SOPs) by Contractors and Project Owners

Don't let parts delays hold up your project schedule

Discuss your spare parts needs today.

FAQ

Frequently Asked Questions (FAQ)